What preparations should be done before installation of dry-type transformers? Anhui Dali Xiaobian will give you a brief introduction.
Preparatory work to be done before transformer installation:
1. Acceptance records.
2. Check the nameplate.
3. Factory documents.
4. Packaging acceptance.
5. Visual inspection.
6. Acceptance of oil-filled accessories.
7. Impact record inspection.
8. Acceptance of nitrogen-filled transportation.
The above is the preparation work before the installation of the dry-type transformer introduced by Anhui Dali Xiaobian.